MULTI OBJECTIVE GENERALIZED RESOURCE CONSTRAINED TWO SIDED ASSEMBLY LINE BALANCING PROBLEM AND COMPUTATIONAL ANALAYSIS

MakaleYalnız künyeScopus SJRQ2

Özet

Assembly of large size products like bus, truck and automobile can perform both sides of assembly line. In such cases, both sides (right and left) of the line are used to achieve for the assembly operation. These types of the lines are called as two sided assembly lines. When large size products are produced, sometimes they require a specific machine or a qualified staff to use this machine. This condition also exposes the problem of resource constraint. Therefore, in this study, a mathematical model for generalized resource constraint two sided assembly line balancing problem is presented, based on literature models and computational analysis is performed for multi-objective situation. Proposed model is run and analyzed over several known test problems by considering three objective functions (Minimization number of station, number of position and resource cost).

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/munzur/4053Resmi atıflarda kullanılan kalıcı adres
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
WoS
8
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorMete, Suleyman
dc.contributor.authorAgpak, Kursad
dc.date.accessioned2026-10-28T14:58:50.427153323Z
dc.date.available2026-10-28T14:58:50.427153323Z
dc.date.issued2013-09
dc.description.abstractAssembly of large size products like bus, truck and automobile can perform both sides of assembly line. In such cases, both sides (right and left) of the line are used to achieve for the assembly operation. These types of the lines are called as two sided assembly lines. When large size products are produced, sometimes they require a specific machine or a qualified staff to use this machine. This condition also exposes the problem of resource constraint. Therefore, in this study, a mathematical model for generalized resource constraint two sided assembly line balancing problem is presented, based on literature models and computational analysis is performed for multi-objective situation. Proposed model is run and analyzed over several known test problems by considering three objective functions (Minimization number of station, number of position and resource cost).
dc.identifier.eissn1304-4915
dc.identifier.endpage575
dc.identifier.issn1300-1884
dc.identifier.issue3
dc.identifier.startpage567
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/munzur/4053
dc.identifier.volume28
dc.identifier.wosWOS:000325158900014
dc.language.isotr
dc.publisherGAZI UNIV, FAC ENGINEERING ARCHITECTURE
dc.relation.ispartofJOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectGeneralized resource constrained
dc.subjecttwo sided assembly line
dc.subject.classificationEngineering, Multidisciplinary
dc.subject.classificationEngineering
dc.subject.otherGENETIC ALGORITHM
dc.subject.otherDESIGN
dc.subject.otherMODEL
dc.subject.otherBRANCH
dc.titleMULTI OBJECTIVE GENERALIZED RESOURCE CONSTRAINED TWO SIDED ASSEMBLY LINE BALANCING PROBLEM AND COMPUTATIONAL ANALAYSIS
dc.typeArticle
rdl.citation.wos8
rdl.oa.statusclosed
rdl.scopus.quartileQ2
rdl.source.indexWOS
rdl.wos.indexScience Citation Index Expanded (SCI-EXPANDED)