Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment

MakaleYalnız künyeScopus SJRQ1

Özet

Undoubtedly, dams are one of the projects developed by people to make optimal water use and generate hydroelectric energy power. In addition to the importance of detailed project planning, faultless production, and optimal working conditions in dam constructions, it is equally important to identify and analyze the risks from the occupational health and safety (OHS) perspective that may arise during construction and operation. In this context, hazard identification, risk analysis, and control, which are the main issues of dam safety, have gained importance. In this study, a novel approach is developed for dam construction safety. Two newly proposed multi-criteria decision-making (MCDM) methods of “Best-Worst Method-BWM” and “measurement of alternatives and ranking to Compromise solution-MARCOS”, are merged under the context of interval type-2 fuzzy sets (IT2FSs). Severity and probability, two essential parameters of the risk score, have been weighted using BWM. Subsequently, the priority orders of hazards have been determined by the MARCOS. In implementing the approach to the blasting process in dam construction, several control measures are suggested for stakeholders. Some comparative works and sensitivity analyses are performed to test the approach's validity and solidity from the methodological viewpoint.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/munzur/2525Resmi atıflarda kullanılan kalıcı adres
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
Scopus
140
WoS
113
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorCelik, Erkan
dc.contributor.authorGul, Muhammet
dc.date.accessioned2026-10-28T14:55:28.927569052Z
dc.date.available2026-10-28T14:55:28.927569052Z
dc.date.issued2021
dc.description.abstractUndoubtedly, dams are one of the projects developed by people to make optimal water use and generate hydroelectric energy power. In addition to the importance of detailed project planning, faultless production, and optimal working conditions in dam constructions, it is equally important to identify and analyze the risks from the occupational health and safety (OHS) perspective that may arise during construction and operation. In this context, hazard identification, risk analysis, and control, which are the main issues of dam safety, have gained importance. In this study, a novel approach is developed for dam construction safety. Two newly proposed multi-criteria decision-making (MCDM) methods of “Best-Worst Method-BWM” and “measurement of alternatives and ranking to Compromise solution-MARCOS”, are merged under the context of interval type-2 fuzzy sets (IT2FSs). Severity and probability, two essential parameters of the risk score, have been weighted using BWM. Subsequently, the priority orders of hazards have been determined by the MARCOS. In implementing the approach to the blasting process in dam construction, several control measures are suggested for stakeholders. Some comparative works and sensitivity analyses are performed to test the approach's validity and solidity from the methodological viewpoint.
dc.identifier.articlenumber103699
dc.identifier.doi10.1016/j.autcon.2021.103699
dc.identifier.eissn1872-7891
dc.identifier.issn0926-5805
dc.identifier.scopus2-s2.0-85104155024
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/munzur/2525
dc.identifier.volume127
dc.identifier.wosWOS:000663444900005
dc.language.isoen
dc.publisherElsevier B.V.
dc.relation.ispartofAutomation in Construction
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectBWM
dc.subjectDam construction safety
dc.subjectInterval type-2 fuzzy set
dc.subjectMARCOS
dc.subjectRisk assessment
dc.subject.classificationConstruction & Building Technology
dc.subject.classificationEngineering, Civil
dc.subject.classificationEngineering
dc.subject.otherBehavioral research
dc.subject.otherDams
dc.subject.otherDecision making
dc.subject.otherFuzzy sets
dc.subject.otherHazards
dc.subject.otherHealth risks
dc.subject.otherHydroelectric power
dc.subject.otherOccupational risks
dc.subject.otherRisk analysis
dc.subject.otherSensitivity analysis
dc.subject.otherBWM
dc.subject.otherConstruction safety
dc.subject.otherDam construction
dc.subject.otherDam construction safety
dc.subject.otherHazard identification
dc.subject.otherInterval type-2 fuzzy sets
dc.subject.otherMARCOS
dc.subject.otherRisks assessments
dc.subject.otherRisks controls
dc.subject.otherWater use
dc.subject.otherRisk assessment
dc.titleHazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment
dc.typeArticle
rdl.citation.scopus140
rdl.citation.wos113
rdl.oa.statusclosed
rdl.scopus.quartileQ1
rdl.source.indexSCOPUS
rdl.source.indexWOS
rdl.wos.indexScience Citation Index Expanded (SCI-EXPANDED)
rdl.wos.indexSocial Science Citation Index (SSCI)