Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment
Özet
Undoubtedly, dams are one of the projects developed by people to make optimal water use and generate hydroelectric energy power. In addition to the importance of detailed project planning, faultless production, and optimal working conditions in dam constructions, it is equally important to identify and analyze the risks from the occupational health and safety (OHS) perspective that may arise during construction and operation. In this context, hazard identification, risk analysis, and control, which are the main issues of dam safety, have gained importance. In this study, a novel approach is developed for dam construction safety. Two newly proposed multi-criteria decision-making (MCDM) methods of “Best-Worst Method-BWM” and “measurement of alternatives and ranking to Compromise solution-MARCOS”, are merged under the context of interval type-2 fuzzy sets (IT2FSs). Severity and probability, two essential parameters of the risk score, have been weighted using BWM. Subsequently, the priority orders of hazards have been determined by the MARCOS. In implementing the approach to the blasting process in dam construction, several control measures are suggested for stakeholders. Some comparative works and sensitivity analyses are performed to test the approach's validity and solidity from the methodological viewpoint.
Anahtar Kelimeler
- Scopus
- 140
- WoS
- 113
Tam Kayıt
| Alan | Değer | Dil |
|---|---|---|
| dc.contributor.author | Celik, Erkan | |
| dc.contributor.author | Gul, Muhammet | |
| dc.date.accessioned | 2026-10-28T14:55:28.927569052Z | |
| dc.date.available | 2026-10-28T14:55:28.927569052Z | |
| dc.date.issued | 2021 | |
| dc.description.abstract | Undoubtedly, dams are one of the projects developed by people to make optimal water use and generate hydroelectric energy power. In addition to the importance of detailed project planning, faultless production, and optimal working conditions in dam constructions, it is equally important to identify and analyze the risks from the occupational health and safety (OHS) perspective that may arise during construction and operation. In this context, hazard identification, risk analysis, and control, which are the main issues of dam safety, have gained importance. In this study, a novel approach is developed for dam construction safety. Two newly proposed multi-criteria decision-making (MCDM) methods of “Best-Worst Method-BWM” and “measurement of alternatives and ranking to Compromise solution-MARCOS”, are merged under the context of interval type-2 fuzzy sets (IT2FSs). Severity and probability, two essential parameters of the risk score, have been weighted using BWM. Subsequently, the priority orders of hazards have been determined by the MARCOS. In implementing the approach to the blasting process in dam construction, several control measures are suggested for stakeholders. Some comparative works and sensitivity analyses are performed to test the approach's validity and solidity from the methodological viewpoint. | |
| dc.identifier.articlenumber | 103699 | |
| dc.identifier.doi | 10.1016/j.autcon.2021.103699 | |
| dc.identifier.eissn | 1872-7891 | |
| dc.identifier.issn | 0926-5805 | |
| dc.identifier.scopus | 2-s2.0-85104155024 | |
| dc.identifier.uri | https://rdlopen.rawdatalibrary.net/r/munzur/2525 | |
| dc.identifier.volume | 127 | |
| dc.identifier.wos | WOS:000663444900005 | |
| dc.language.iso | en | |
| dc.publisher | Elsevier B.V. | |
| dc.relation.ispartof | Automation in Construction | |
| dc.rights | info:eu-repo/semantics/closedAccess | |
| dc.subject | BWM | |
| dc.subject | Dam construction safety | |
| dc.subject | Interval type-2 fuzzy set | |
| dc.subject | MARCOS | |
| dc.subject | Risk assessment | |
| dc.subject.classification | Construction & Building Technology | |
| dc.subject.classification | Engineering, Civil | |
| dc.subject.classification | Engineering | |
| dc.subject.other | Behavioral research | |
| dc.subject.other | Dams | |
| dc.subject.other | Decision making | |
| dc.subject.other | Fuzzy sets | |
| dc.subject.other | Hazards | |
| dc.subject.other | Health risks | |
| dc.subject.other | Hydroelectric power | |
| dc.subject.other | Occupational risks | |
| dc.subject.other | Risk analysis | |
| dc.subject.other | Sensitivity analysis | |
| dc.subject.other | BWM | |
| dc.subject.other | Construction safety | |
| dc.subject.other | Dam construction | |
| dc.subject.other | Dam construction safety | |
| dc.subject.other | Hazard identification | |
| dc.subject.other | Interval type-2 fuzzy sets | |
| dc.subject.other | MARCOS | |
| dc.subject.other | Risks assessments | |
| dc.subject.other | Risks controls | |
| dc.subject.other | Water use | |
| dc.subject.other | Risk assessment | |
| dc.title | Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment | |
| dc.type | Article | |
| rdl.citation.scopus | 140 | |
| rdl.citation.wos | 113 | |
| rdl.oa.status | closed | |
| rdl.scopus.quartile | Q1 | |
| rdl.source.index | SCOPUS | |
| rdl.source.index | WOS | |
| rdl.wos.index | Science Citation Index Expanded (SCI-EXPANDED) | |
| rdl.wos.index | Social Science Citation Index (SSCI) |