An efficient algorithm for U-type assembly line re-balancing problem with stochastic task times

MakaleYalnız künyeScopus SJRQ2
  • SDG 9 · Sanayi, Yenilikçilik ve Altyapı

Özet

Purpose: Changing the product characteristics and demand quantity resulting from the variability of the modern market leads to re-assigned tasks and changing the cycle time on the production line. Therefore, companies need re-balancing of their assembly line instead of balancing. The purpose of this paper is to propose an efficient algorithm approach for U-type assembly line re-balancing problem using stochastic task times. Design/methodology/approach: In this paper, a genetic algorithm is proposed to solve approach for U-type assembly line re-balancing problem using stochastic task times. Findings: The performance of the genetic algorithm is tested on a wide variety of data sets from literature. The task times are assumed normal distribution. The objective is to minimize total re-balancing cost, which consists of workstation cost, operating cost and task transposition cost. The test results show that proposed genetic algorithm approach for U-type assembly line re-balancing problem performs well in terms of minimizing total re-balancing cost. Practical implications: Demand variation is considered for stochastic U-type re balancing problem. Demand change also affects cycle time of the line. Hence, the stochastic U-type re-balancing problem under four different cycle times are analyzed to present practical case. Originality/value: As per the authors’ knowledge, it is the first time that genetic algorithm is applied to stochastic U-type re balancing problem. The large size data set is generated to analyze performance of genetic algorithm. The results of proposed algorithm are compared with ant colony optimization algorithm.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/munzur/3308Resmi atıflarda kullanılan kalıcı adres
DOI
https://doi.org/10.1108/aa-07-2018-106Yayıncı resmi DOI adresi
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
Scopus
19
WoS
17
OpenAlex
20
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorSerin, Faruk
dc.contributor.authorMete, Süleyman
dc.contributor.authorÇelik, Erkan
dc.date.accessioned2026-10-28T14:56:28.108550805Z
dc.date.available2026-10-28T14:56:28.108550805Z
dc.date.issued2019
dc.description.abstractPurpose: Changing the product characteristics and demand quantity resulting from the variability of the modern market leads to re-assigned tasks and changing the cycle time on the production line. Therefore, companies need re-balancing of their assembly line instead of balancing. The purpose of this paper is to propose an efficient algorithm approach for U-type assembly line re-balancing problem using stochastic task times. Design/methodology/approach: In this paper, a genetic algorithm is proposed to solve approach for U-type assembly line re-balancing problem using stochastic task times. Findings: The performance of the genetic algorithm is tested on a wide variety of data sets from literature. The task times are assumed normal distribution. The objective is to minimize total re-balancing cost, which consists of workstation cost, operating cost and task transposition cost. The test results show that proposed genetic algorithm approach for U-type assembly line re-balancing problem performs well in terms of minimizing total re-balancing cost. Practical implications: Demand variation is considered for stochastic U-type re balancing problem. Demand change also affects cycle time of the line. Hence, the stochastic U-type re-balancing problem under four different cycle times are analyzed to present practical case. Originality/value: As per the authors’ knowledge, it is the first time that genetic algorithm is applied to stochastic U-type re balancing problem. The large size data set is generated to analyze performance of genetic algorithm. The results of proposed algorithm are compared with ant colony optimization algorithm.
dc.identifier.doi10.1108/aa-07-2018-106
dc.identifier.eissn1758-4078
dc.identifier.endpage595
dc.identifier.issn0144-5154
dc.identifier.issue4
dc.identifier.scopus2-s2.0-85067314609
dc.identifier.startpage581
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/munzur/3308
dc.identifier.volume39
dc.identifier.wosWOS:000488835500008
dc.language.isoen
dc.publisherEmerald Group Holdings Ltd.
dc.relation.ispartofAssembly Automation
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectAssembly line
dc.subjectGenetic algorithms
dc.subjectRe-balancing
dc.subjectStochastic task times
dc.subjectU-type
dc.subject.classificationAutomation & Control Systems
dc.subject.classificationEngineering, Manufacturing
dc.subject.classificationEngineering
dc.subject.otherAnt colony optimization
dc.subject.otherAssembly machines
dc.subject.otherGenetic algorithms
dc.subject.otherNormal distribution
dc.subject.otherStochastic systems
dc.subject.otherAlgorithm approaches
dc.subject.otherAnt Colony Optimization algorithms
dc.subject.otherAssembly line
dc.subject.otherDesign/methodology/approach
dc.subject.otherGenetic algorithm approach
dc.subject.otherProduct characteristics
dc.subject.otherStochastic task
dc.subject.otherU-type assembly line
dc.subject.otherAssembly
dc.titleAn efficient algorithm for U-type assembly line re-balancing problem with stochastic task times
dc.typeArticle
rdl.citation.openalex20
rdl.citation.scopus19
rdl.citation.wos17
rdl.oa.statusclosed
rdl.scopus.quartileQ2
rdl.sdgSDG09
rdl.source.indexSCOPUS
rdl.source.indexWOS
rdl.wos.indexScience Citation Index Expanded (SCI-EXPANDED)