Business Process Reengineering with Simulation Method

MakaleYalnız künye

Özet

The aim of this study is to establish the Turkish Lokomotif Sanayi A.Ş., which serves as the locomotive of the Turkish Heavy Industry. (TÜLOMSAŞ) 14 bench, 30 personnel and bogie workshop business process change engineering methods by using simulation models suitable for Hammer Champy model, to renew the processes, to utilize the technology more while renewing the processes and to produce much better quality products. To do this, six scenarios were developed by considering the constraints of the factory and all the business processes which were either feasible, but whose operation was uncertain, and models were created by using the computerized ARENA 9.0 Simulation program in this scenario. As a result of total 12 months of change engineering engineering applications, the scenario giving the closest result to the most applicable targets was selected and the annual bogie amount was increased to 2164 with the scenario selected while the annual bogie amount was 2029 before the change engineering application. With this study, the change that will be realized with the change engineer applications in the railway sector will be able to eliminate all the uncertainty states with the established simulation models and to examine the business processes in detail.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/munzur/5367Resmi atıflarda kullanılan kalıcı adres
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
TR Dizin
0
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorŞenel, Mine
dc.contributor.authorŞenel, Bilgin
dc.contributor.authorAkan, Yaprak
dc.date.accessioned2026-10-28T15:07:11.438464784Z
dc.date.available2026-10-28T15:07:11.438464784Z
dc.date.issued2017
dc.description.abstractThe aim of this study is to establish the Turkish Lokomotif Sanayi A.Ş., which serves as the locomotive of the Turkish Heavy Industry. (TÜLOMSAŞ) 14 bench, 30 personnel and bogie workshop business process change engineering methods by using simulation models suitable for Hammer Champy model, to renew the processes, to utilize the technology more while renewing the processes and to produce much better quality products. To do this, six scenarios were developed by considering the constraints of the factory and all the business processes which were either feasible, but whose operation was uncertain, and models were created by using the computerized ARENA 9.0 Simulation program in this scenario. As a result of total 12 months of change engineering engineering applications, the scenario giving the closest result to the most applicable targets was selected and the annual bogie amount was increased to 2164 with the scenario selected while the annual bogie amount was 2029 before the change engineering application. With this study, the change that will be realized with the change engineer applications in the railway sector will be able to eliminate all the uncertainty states with the established simulation models and to examine the business processes in detail.
dc.identifier.eissn2147-9771
dc.identifier.endpage295
dc.identifier.issn1304-5318
dc.identifier.issue30
dc.identifier.startpage275
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/munzur/5367
dc.identifier.volume15
dc.language.isotr
dc.relation.ispartofYönetim Bilimleri Dergisi
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectDenizcilik
dc.subjectMühendislik, Makine
dc.subjectEndüstri Mühendisliği
dc.subjectİmalat Mühendisliği
dc.titleBusiness Process Reengineering with Simulation Method
dc.typeArticle
rdl.citation.trdizin0
rdl.source.indexTRDIZIN