Holding of dam water levels at optimum with fuzzy linear programming when electricity is produced in serried dam lakes

MakaleYalnız künye

Özet

In this study, the Euphrates river basin in a sequential manner established a scenario modeled after Turkey's three largest hydropower plant was established. In this scenario, according to the needs of the interconnected system, the lake levels of these three dams were kept at the highest possible level and energy was produced. In this way, the maximum level of water, which means energy, is kept and the turbine-generator units are operated at the highest possible efficiency and electricity is produced. The demand for electricity, the minimum and maximum water required in the dams, were handled as turbid. Then, for the determined scenario, the energy required by the interconnected system from these dams is determined from which dam and how many units will work for how long.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/munzur/6803Resmi atıflarda kullanılan kalıcı adres
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
TR Dizin
0
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorYucesan, Melih
dc.contributor.authorKahraman, Gökhan
dc.date.accessioned2026-10-28T15:12:03.148814295Z
dc.date.available2026-10-28T15:12:03.148814295Z
dc.date.issued2020
dc.description.abstractIn this study, the Euphrates river basin in a sequential manner established a scenario modeled after Turkey's three largest hydropower plant was established. In this scenario, according to the needs of the interconnected system, the lake levels of these three dams were kept at the highest possible level and energy was produced. In this way, the maximum level of water, which means energy, is kept and the turbine-generator units are operated at the highest possible efficiency and electricity is produced. The demand for electricity, the minimum and maximum water required in the dams, were handled as turbid. Then, for the determined scenario, the energy required by the interconnected system from these dams is determined from which dam and how many units will work for how long.
dc.identifier.eissn1308-2477
dc.identifier.endpage43
dc.identifier.issn1012-0726
dc.identifier.issue135
dc.identifier.startpage36
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/munzur/6803
dc.identifier.volume0
dc.language.isotr
dc.relation.ispartofDSİ Teknik Bülteni
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectSu Kaynakları
dc.titleHolding of dam water levels at optimum with fuzzy linear programming when electricity is produced in serried dam lakes
dc.typeArticle
rdl.citation.trdizin0
rdl.source.indexTRDIZIN