A multicriteria approach to integrating occupational safety & health performance and industry systems productivity in the context of aging workforce: A case study

MakaleAçık ErişimScopus SJRQ1
  • SDG 3 · Sağlık ve Kaliteli Yaşam
  • SDG 8 · İnsana Yakışır İş ve Ekonomik Büyüme

Özet

Aging represents one of the greatest challenges that mankind will have to face in the 21st century. In this regard, there is a need to deepen the technical and organizational aspects for rebalancing the job/employee relationship. Nevertheless, there are no robust approaches assisting decision-makers in the effective management of Occupational Safety & Health Performance (OSHP) and Industry Systems Productivity (ISP) convergence with a focus on Aging Workforce (AW). There is no single and unique solution. Therefore, in a win-to-win logic that favors the characteristic of the reference scenario, the aim of this paper is to propose a multicriteria approach to integrate OSHP and ISP in the context of AW. More specifically, Intuitionistic Fuzzy Analytic Hieararchy Process (IF-AHP) was used to elicit the criteria and sub-criteria under uncertainty considering degree of belongingness and non-belongingness. Decision Making Trial and Evaluation Laboratory (DEMATEL) was applied to evaluate the presence and strength of the interrelations and feedback among OSHP and ISP criteria and sub-criteria. Finally, Combined Compromise Solution (CoCoSo) was implemented to calculate a Working Suitability Index (WSI) per aging. Based on this index, interventions on each worker are proposed to underpin redesign of the company while to provide a flexible management propelling high performance in terms of OSHP and ISP. A real case study in Colombia is presented. The results revealed that Efficiency and Quality with 0.162 were found to be the most important factors in evaluating the performance of aging electrical engineers while Psychosocial risk and Occupational Safety were concluded to be the main drivers for a joint OSHP-ISP aging workforce management. The model can be an useful tool for policy and business decision-makers from the electrical sector and can be replicated with slight changes in other industries.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/munzur/2972Resmi atıflarda kullanılan kalıcı adres
DOI
https://doi.org/10.1016/j.ssci.2022.105764Yayıncı resmi DOI adresi
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
Scopus
17
WoS
11
OpenAlex
23
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorOrtiz-Barrios, Miguel
dc.contributor.authorSilvera-Natera, Esnela
dc.contributor.authorPetrillo, Antonella
dc.contributor.authorGul, Muhammet
dc.contributor.authorYucesan, Melih
dc.date.accessioned2026-10-28T14:56:03.464128650Z
dc.date.available2026-10-28T14:56:03.464128650Z
dc.date.issued2022
dc.description.abstractAging represents one of the greatest challenges that mankind will have to face in the 21st century. In this regard, there is a need to deepen the technical and organizational aspects for rebalancing the job/employee relationship. Nevertheless, there are no robust approaches assisting decision-makers in the effective management of Occupational Safety & Health Performance (OSHP) and Industry Systems Productivity (ISP) convergence with a focus on Aging Workforce (AW). There is no single and unique solution. Therefore, in a win-to-win logic that favors the characteristic of the reference scenario, the aim of this paper is to propose a multicriteria approach to integrate OSHP and ISP in the context of AW. More specifically, Intuitionistic Fuzzy Analytic Hieararchy Process (IF-AHP) was used to elicit the criteria and sub-criteria under uncertainty considering degree of belongingness and non-belongingness. Decision Making Trial and Evaluation Laboratory (DEMATEL) was applied to evaluate the presence and strength of the interrelations and feedback among OSHP and ISP criteria and sub-criteria. Finally, Combined Compromise Solution (CoCoSo) was implemented to calculate a Working Suitability Index (WSI) per aging. Based on this index, interventions on each worker are proposed to underpin redesign of the company while to provide a flexible management propelling high performance in terms of OSHP and ISP. A real case study in Colombia is presented. The results revealed that Efficiency and Quality with 0.162 were found to be the most important factors in evaluating the performance of aging electrical engineers while Psychosocial risk and Occupational Safety were concluded to be the main drivers for a joint OSHP-ISP aging workforce management. The model can be an useful tool for policy and business decision-makers from the electrical sector and can be replicated with slight changes in other industries.
dc.identifier.articlenumber105764
dc.identifier.doi10.1016/j.ssci.2022.105764
dc.identifier.eissn1879-1042
dc.identifier.issn0925-7535
dc.identifier.scopus2-s2.0-85127536538
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/munzur/2972
dc.identifier.volume152
dc.identifier.wosWOS:000791307000005
dc.language.isoen
dc.publisherElsevier B.V.
dc.relation.ispartofSafety Science
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectAging workforce
dc.subjectCoCoSo
dc.subjectDEMATEL
dc.subjectIF-AHP
dc.subjectIndustrial safety performance
dc.subjectMulti-criteria decision making
dc.subjectOccupational safety and health performance
dc.subject.classificationEngineering, Industrial
dc.subject.classificationOperations Research & Management Science
dc.subject.classificationEngineering
dc.subject.otherDecision making
dc.subject.otherFuzzy sets
dc.subject.otherHealth
dc.subject.otherHierarchical systems
dc.subject.otherHuman resource management
dc.subject.otherOccupational risks
dc.subject.otherProductivity
dc.subject.otherRisk management
dc.subject.otherAging workforce
dc.subject.otherCombined compromize solution
dc.subject.otherDecision making trial and evaluation laboratory
dc.subject.otherDecisions makings
dc.subject.otherIndustrial safety performance
dc.subject.otherIntuitionistic fuzzy
dc.subject.otherIntuitionistic fuzzy analytic hieararchy process
dc.subject.otherMulti criteria decision-making
dc.subject.otherMulticriteria decision-making
dc.subject.otherMulticriterion decision makings
dc.subject.otherOccupational safety and health performance
dc.subject.otherOccupational safety and healths (OSH)
dc.subject.otherPerformance
dc.subject.otheraging
dc.subject.otherarticle
dc.subject.otherColombia
dc.subject.otherhuman
dc.subject.otherlogic
dc.subject.othermulticriteria decision analysis
dc.subject.otheroccupational safety
dc.subject.otheruncertainty
dc.subject.otherworker
dc.subject.otherworkforce
dc.subject.otherAccident prevention
dc.titleA multicriteria approach to integrating occupational safety & health performance and industry systems productivity in the context of aging workforce: A case study
dc.typeArticle
rdl.citation.openalex23
rdl.citation.scopus17
rdl.citation.wos11
rdl.oa.statusgreen
rdl.oa.statuspreprint
rdl.oa.urlhttps://hdl.handle.net/11323/9223
rdl.scopus.quartileQ1
rdl.sdgSDG08
rdl.sdgSDG03
rdl.source.indexSCOPUS
rdl.source.indexWOS
rdl.wos.indexScience Citation Index Expanded (SCI-EXPANDED)